Our pre-owned NetApp AFF C190 all-flash hardware offers high-performance and scalable solutions for your data storage needs at a fraction of the cost of the OEM. You can trust our hardware to deliver reliable and efficient performance for your business operations. Plus, by choosing pre-owned equipment, you’re making a sustainable choice that reduces electronic waste and saves valuable resources.
Controller form factor: 2U
Capacity: Up to 24 960GB SSDs, 50TB Total
Connectivity: 4 ports—12Gb/6Gb SAS
1GbE management port, USB port
8 ports—FC target (16Gb)
8 ports—FCoE target, UTA2
12 ports—10GbE ports, UTA2
12 ports—10GBASE-T
Compatible Shelves: DS224C, NS224
Pre Rack
-
Multi-vender agnostic
-
Single point of contact
-
Get a quote in hours/days
-
Fully configured, ready to ship systems as fast as 2-3 days
-
Extended asset lifecycle with pre-owned hardware
-
Systems and parts stocked locally
-
Assistance with installation
Pre Rack
-
Multi-vender agnostic
-
Single point of contact
-
Get a quote in hours/days
-
Fully configured, ready to ship systems as fast as 2-3 days
-
Extended asset lifecycle with pre-owned hardware
-
Systems and parts stocked locally
-
Assistance with installation
OEM
-
Not trained on all major OEMs
-
Communication with multiple reps
-
Waiting weeks for a quote
-
Prolonged lead time
-
Will attempt to get you to buy the latest new hardware (hardware refresh)
-
No longer selling hardware after EOL
OEM
-
Not trained on all major OEMs
-
Communication with multiple reps
-
Waiting weeks for a quote
-
Prolonged lead time
-
Will attempt to get you to buy the latest new hardware (hardware refresh)
-
No longer selling hardware after EOL
High cost to renew with the OEM?
"Very fast response time and worked diligently with me until the problem was solved."
"Pre Rack IT helped disassemble EMC SANs, VMware hosts, and Cisco Switches, between Michigan and Georgia."
"We have not been able to find this level of knowledge at a reasonable price and timing as we do with Pre Rack IT. They are vital to our success."
"Pre Rack IT was simply great to work with, we felt like we had a true partner. The data center move project was completed ahead of schedule."
"Under a tight time table - 90 days, Pre Rack IT took the lead on 95% of all our purchases, logistics, trucking and man power."

