The Data Domain DD6300 is a high-capacity data deduplication appliance engineered to enhance storage efficiency and data protection. Ideal for large enterprises, it offers advanced deduplication and compression technologies, reducing storage costs while ensuring reliable backup and fast recovery. With seamless integration and user-friendly management, the DD6300 empowers businesses to manage their data effectively, optimize resources, and confidently navigate the challenges of modern data management.
Max Usable Capacity: Up to 178TB
ES30 and ES60 Shelves: 3TB, 4TB
Drive Type: SAS
Maximum Throughput: 8.5TB/hr
Maximum Throughput (DD Boost): 24TB/hr
Pre Rack
-
Multi-vender agnostic
-
Single point of contact
-
Get a quote in hours/days
-
Fully configured, ready to ship systems as fast as 2-3 days
-
Extended asset lifecycle with pre-owned hardware
-
Systems and parts stocked locally
-
Assistance with installation
Pre Rack
-
Multi-vender agnostic
-
Single point of contact
-
Get a quote in hours/days
-
Fully configured, ready to ship systems as fast as 2-3 days
-
Extended asset lifecycle with pre-owned hardware
-
Systems and parts stocked locally
-
Assistance with installation
OEM
-
Not trained on all major OEMs
-
Communication with multiple reps
-
Waiting weeks for a quote
-
Prolonged lead time
-
Will attempt to get you to buy the latest new hardware (hardware refresh)
-
No longer selling hardware after EOL
OEM
-
Not trained on all major OEMs
-
Communication with multiple reps
-
Waiting weeks for a quote
-
Prolonged lead time
-
Will attempt to get you to buy the latest new hardware (hardware refresh)
-
No longer selling hardware after EOL
"Very fast response time and worked diligently with me until the problem was solved."
"Pre Rack IT helped disassemble EMC SANs, VMware hosts, and Cisco Switches, between Michigan and Georgia."
"We have not been able to find this level of knowledge at a reasonable price and timing as we do with Pre Rack IT. They are vital to our success."
"Pre Rack IT was simply great to work with, we felt like we had a true partner. The data center move project was completed ahead of schedule."
"Under a tight time table - 90 days, Pre Rack IT took the lead on 95% of all our purchases, logistics, trucking and man power."

